海洋石油工程股份有限公司 lng-凯发

services

projects

lng

lng storage tanks

service capability:

      r&d, overall design, and epc of full containment prestressed concrete lng storage tanks with volumes ranging from 30,000 m3 to 270,000 m3;

      standard design system for lng storage tanks;

      digital collaborative design based on spf (smartplant foundation, an intelligent information integration platform);

      treatment of the foundations of lng storage tanks and structural optimization of lng storage tanks under multiple geologic conditions in coastal areas and along inland waterways;

      vibration mitigation and isolation, cryogenic insulation, and the use of locally manufactured products for super large lng storage tanks;

      world-leading automatic welding technique for welding the inner shells (containers) of lng storage tanks.

industrial qualifications:

      class a design qualification for the oil and natural gas (offshore oil) industry;

      grade iii qualification for main contractors of petrochemical projects;

      class c qualification for professional consultants in the oil and natural gas industry.

projects:

1、tianjin lng storage tank epc project

location: tianjin, china

duration: january 2013-november 2014

scope of work: engineering, procurement, construction and commissioning (epcc) of two 30,000 m3 full containment concrete cryogenic lng storage tanks and related technical services.

owner: cnooc tianjin liquefied natural gas co., ltd


2、guangxi lng storage tank epc project

location: guangxi, china

duration: april 2014-october 2015

scope of work: engineering, procurement, construction and commissioning (epcc) of two 30,000 m3 full containment concrete cryogenic lng storage tanks and related technical services

owner: cnooc guangxi fangchenggang natural gas co., ltd


3、tianjin 160,000 m3 lng storage tank epc project

location: tianjin, china

duration: may 2016-october 2018

scope of work: engineering, procurement, construction, installation, inspection, test and startup of a 160,000 m3 full containment prestressed concrete cryogenic lng storage tank and related technical services

owner: cnooc tianjin liquefied natural gas co., ltd

lng terminals

service capability:

      whole-process consulting and overall planning and design of large lng terminals with capacity measured at 10,000,000 tons;

      execution of large lng terminal projects measured at 10,000,000 tons;

      epc of large lng terminals with capacity greater than 10,000,000 tons per annum.

industrial qualifications:

      class a design qualification for the oil and natural gas (offshore oil) industry;

      grade iii qualification for main contractors of petrochemical projects;

      class c qualification for professional consultants in the oil and natural gas industry.

projects:

1、zhejiang lng terminal phase ii project

location: zhejiang, china

duration: june 2018-december 2020

scope of work: engineering, procurement, construction, commissioning and startup of three 160,000 m3 lng storage tanks, and the expansion of the auxiliary facilities of the lng terminal with a capacity of 3.00 million tons per annum (mtpa).

owner: cnooc zhejiang ningbo liquefied natural gas co., ltd


2、zhangzhou lng terminal project

location: fujian, china

duration: july 2018-october 2022

scope of work: engineering, procurement, construction, commissioning and startup of two 160,000 m3 lng storage tanks, and the construction of the lng terminal with a capacity of 3.00 mtpa.

owner: pipechina fujian investment natural gas co., ltd


3、tangshan lng terminal project

location: hebei, china

duration: may 2019-august 2024

scope of work: engineering, procurement, construction, commissioning and startup of eight 200,000 m3 lng storage tanks and auxiliary facilities, and the construction of the lng terminal with a capacity of 17.00 mtpa, office buildings in the plant area, etc.

owner: caofeidian xintian lng co., ltd


4、tianjin lng terminal phase ii project

location: tianjin, china

duration: april 2020-august 2023

scope of work: engineering, procurement, construction, commissioning and startup of six 220,000 m3 lng storage tanks and auxiliary facilities, and the expansion of the auxiliary facilities of the lng terminal with a capacity of 10.00 mtpa.

owner: pipechina tianjin lng co., ltd


5、longkou lng terminal project

location: shandong, china

duration: april 2020-september 2023

scope of work: engineering, procurement, construction, commissioning and startup of six 220,000 m3 lng storage tanks and auxiliary facilities, and the construction of the lng terminal with a capacity of 10.00 mtpa.

owner: pipechina nanshan (shandong) natural gas co., ltd


6、zhuhai lng terminal phase ii project

location: guangdong, china

duration: june 2021-december 2023 (estimated)

scope of work: engineering, procurement, construction, commissioning and startup of five 270,000 m3 lng storage tanks and additional auxiliary facilities and other related services, and the expansion of the auxiliary facilities of the lng terminal with a capacity of 7.00 mtpa.

owner: guangdong zhuhai golden bay lng co., ltd

       

liquefaction plants

service capability:

      systematic overall planning and design of liquefaction plants;

      engineering applications based on proven liquefaction processes in the industry;

      execution of epc projects related to the digital design and modular construction of liquefaction plants.

industrial qualifications:

      class a design qualification for the oil and natural gas (offshore oil) industry;

      grade iii qualification for main contractors of petrochemical projects;

      class c qualification for professional consultants in the oil and natural gas industry.

projects:

1、xi’an lng peak shaving facilities epcm project

location: shaanxi, china

duration: april 2018-december 2023 (estimated)

scope of work: preliminary design review, part of detailed design, and whole-process project management services for a natural gas liquefaction plant with a processing capacity of 3000,000 m3/d, two lng regasification units with a processing capacity of 6000,000 m3/d, two 50,000 m3 full containment lng storage tanks, one 160,000 m3 full containment lng storage tank, and auxiliary facilities

owner: shaanxi liquefied natural gas reserves & logistics co., ltd

网站地图